The video recorded when the contractor want get Letter of Working Contract and Letter of Command Working (SPK), they the money to the Activities of Technical Operation (PPTK) as a The Operational Project Responsibility in APBN 2008 in Ministry of Education. The money must paid amount Rp 1,5 billion for that project. If not, the letters very hard to be done. the Secretary of Ministry of Education said that the money was “Thanksgiving“ from the contractor about the fast service to them. The consequence is the contractor can or only can to build with lower project standard, like in 2007, where bad result of many projects of new schools building.
I think, this is a general condition in Indonesia especially in Nanggroe Aceh Darussalam (NAD). At the beginning, that is real thanksgiving money about the project working successfully. But the real condition now is so different, eventhough still thanksgiving money that have standard. How can the giving have standard ?
In Utilitarianism Theory aimed to benefit and cost. The socially responsibility action is the action able to give high benefit or low cost to society. Based on this statement, Never mind if the contractor deals to pay the money appropriate with PPTK request but the contractor must do the project very well. The Real condition, that impossible because Rp 1.5 billion is not little money. So the contractor can not the best. So, that is wrong way because can retain the contractor to the best, either to them or society.

Tidak ada komentar: